Free PDF

RV Full-Hookup Campground Setup

An ordered arrival checklist for positioning, leveling, shore power, potable water, sewer, slides, and final leak checks.

31 items5 sectionsarrival
  • Campground sites with electrical, potable-water, and sewer hookups
  • Travel trailers, fifth wheels, and motorhomes using manual-led leveling
  • Arrival from site survey through the occupied-site recheck

Download PDF

Inside the checklist

5 focused sections

  • Survey & Position
  • Level, Unhitch & Stabilize
  • Connect Shore Power
  • Connect Water & Sewer
  • Open & Recheck the Site

Get the checklist

31 checks in a print-ready PDF.

Download PDF